ALLAWAY MANTACENTRAL VACUUM CLEANING SYSTEMPLANNING AND INSTALLATION MANUAL
10Always connect the elbow coupling to a dust pipe without a sleeve. The sleeve can be cut from an intact dust pipe using a ne-toothed saw or a pipe
118.8. Leadthrough to the air-raid shelterOnly use ofcially approved leadthrough anges for leading the pipe through to an air-raid shelter. If the
129. Chanelling the exhaust airIt may be useful to perform the installation of the exhaust air duct together with the ventilation work. Use a spiral-w
1310.1. Installation frequency and heightThe locations of the wall inlets should allow the entire area to be cleaned using a standard length suction h
1410.4. Installing the wall inlet to a slab wall using a mounting plateThe wall inlets are easiest installed on hollow walls with a wood or metal fram
1510.5. Beam thickness in ush mountingWhen ush mounting a wall inlet, the minimum distance between the external surface of the wall inlet and the fr
1610.6. Installing a wall inlet on cast walls or oorsWhen installing a wall inlet in casting, use a mounting bracket and a protective cover to ensure
1711. Starting circuit and turning on the systemLead the low voltage lead rst between the wall inlets, and finally to the central unit. A
18Follow these instructions to start and turn off the central unit when using RST wall inlets:1. Push the suction hose coupling muff to the wall inlet
1914. The Manta APC 3 central unitThe Automatic Power Control (APC) for the central unit is intended for increasing the power of the c
2We reserve the right to make changes.1. Usages ...
15. Work description for the central vacuuming system (model)You can download work specication templates for the various Manta models in Word format
33.1. System for one userFor systems for one user, lead the piping from the wall inlets to the central unit using the shortest possible route. The wal
43.2. System for several usersTwo basic points are used as the basis for the planning:1) The amount of air vacuumed simultaneously by two users does n
5In buildings with several oors, the Ø 75 mm collector pipe of the central unit can be led vertically through the oors, or the Ø 44 mm dust pipes fr
64. Technical information for the central unitsThe temperature of the motor or turbine may rise to almost 80SDgrC. The turbine is equipped
7Fan diagrams for the central unitsThe air quantities and low pressures for the Manta 3000 and Manta 6000 central units are measured at the turbine.Th
86. Location of the central unitSeveral factors affect the location of the central unit. The following section discusses the situation for one central
97.2. Parts of the dust pipingThe following factory-made parts are availablefor the installation of the dust piping:Dust pipe 0.6 m, Ø 44 mmDust pipe
Comments to this Manuals